inner-banner-img

Guidelines regarding provision, installation and functioning of weighbridges.

Guidelines regarding provision, installation and functioning of weighbridges.

Compendium_Provision of Weighbridge_December 2024

 

Rates Master Circular on Provision and functioning of weighbridges

Rates Master Circular Subject Board’s Letter No. Date of Issue
Addendum No.2 of Rates Master Circular/Provision of Weighbridge/2019/0 Acceptance of weight provided by Static Weighbridge TC-1/2021/108/efile/2 (3367147) 06.09.2024
Addendum to Rates Master Circular/Provision of Weighbridge/2019/0  Acceptance of weight provided by Static Weighbridge  TC-I/2021/108/efile/2 (3367147)  23.02.2024
Corrigendum No.2 to Rates Master Circular/Provision of Weighbridge/2019/0 dt.11.01.2022 Permission for Weightometer/Pre-weighbin system of weighment in private sidings  TC-I/2021/108/efile/2 (3367147/337972)  11.01.2022
Corrigendum to RMC/Provision of Weighbridge/2019/0  Guidelines for installation of weighbridge by private party on railway land TC-I/2020/108/NR 13.08.2020
RMC/Provision of Weighbridge/2019/0 Guidelines regarding provision and functioning of weighbridge TC-I/2019/108/1 11.07.2019
Corrigendum No. 9 to RMC/Weighbridge/2014/0 Continuance of Static weighbridges in certain locations TC-I/2005/108/3 Pt.III 28.09.2018
Addendum to RMC/Weighbridge/2014/0 Weightometer/Pre-weighbin System of weighment in private sidings TC-I/2014/108/2 18.06.2018
Corrigendum No. 8 to RMC/Weighbridge/2014/0 Continuance of Static weighbridges in certain locations TC-I/2005/108/3 Pt. III 13.03.2018
Corrigendum No. 7 to RMC/Weighbridge/2014/0 Weighbridge out of order – Power to DRM to permit loading. TC-I/2017/109/8 10.01.2018
Corrigendum No.6 to RMC/Weighbridges/2014/0 Continuance of Static weighbridges in certain locations TC-I/2005/108/3-Pt.III 29.03.2017
Corrigendum No. 5 to RMC / Weighbridge / 2014/ 0 Continuance of Static weighbridges in certain locations TC-I/2005/108/3 Pt.III 30.10.2015
Corrigendum No. 4 to RMC/ Weighbridge / 2014 / 0 Continuance of Static weighbridges in certain locations TC-I/2014/108/2 15.04.2015
Corrigendum No. 3 to RMC/ Weighbridge / 2014 / 0 Continuance of Static weighbridges in certain locations TC-I/2014/108/2 05.11.2014
Corrigendum No.2 to RMC/ Weighbridge / 2014 / 0 Continuance of Static weighbridges in certain locations TC-I/2014/108/2 09.09.2014
Corrigendum No. 1 to RMC/Weighbridge / 2014 / 0 Continuance of Static weighbridges in certain locations TC-I/2014/108/2 09.07.2014
Rates Master Circular / Provision of Weighbridge / 2014 / 0 Guidelines regarding provision, installation and functioning of weighbridges TC-I/2014/108/2 12.06.2014

Clarification/Other relevant instructions Rates Master Circular on Provision and functioning of weighbridges

Subject Board’s Letter No. Issue Date
Updating Weighbridge details in TMS system for all loading terminals TC-I/2021/108/efile/1 (3366981) 14.02.2025
Acceptance of Weight provided by Static Weighbridge  TC-1/2021/108/efile/2 (3367147) 31.12.2024
Integration of EIMWBs with FOIS - Hosting of application software of EIMWB OEMs on Railway Cloud Server TC-1/2020/108/efile/1 (3323287) 20.09.2024
Integration of EIMWBs with FOIS- Hosting of application software of EIMWB OEMs on Railway cloud server  TC-1/2020/108/efile/1 (3323287/3323065) 22.09.2022
Installation of road weighbridge by private party on railway land  TC-1/2021/108/efile/1 (3378884) 17.08.2022
Provision of weighbridge at loading point TC-1/2021/109/3 (3368295) 18.07.2022
Functioning of Weighbridge TC-I/2020/108/efile/1- Part(1) (3325217) 11.07.2022
TC-I/2020/108/efile/1 (3323287)  Integration of EIMWBs with FOIS 01.07.2022
Installation of Road Weighbridge at Railway Goods Sheds TC-I/2021/108/efile/3(3378884) 16.06.2022
rovProvision of weighbridge for loading points of DFCCIL  TC-I/2021/108/efile/1 (3366981) 04.05.2022
Integration of EIMWBs of Durgapur Steel Plant(DSP)/SAIL with FOIS No.TC-I/2020/108/efile/1 (3323287) 22.04.2022
Speed restriction from loading point to first available weighbridge No.TC-I/2020/109/efile/1 (3323589) 11.04.2022
Provision of Weighbridges at all loading points TC-I/2021/108/efile/1 (3366981) 21.03.2022
Hosting of weighbridge software/data of FOIS application server/IR (cloud)-Generation of Railway Receipt  TC-I/2020/108/efile/1 (3323287/3323065) 24.02.2022
Installation of Road weighbridge at goods shed TC-I/2021/108/efile/3 (3378884)  15.02.2022
Functioning of Weighbridges TC-1/2020/108/efile/1-Part(1) (3325217 03.02.2022
Guidelines regarding installation of road weighbridge at goods shed  TC-1/2021/108/efile/3 (3378884) 03.01.2022
Weighbridges and Weighment TC-I/2021/108/efile/1 (3366981)  12.11.2021
Integration of weighbridge with FOIS-Read only access to Private sidings TC-I/2020/108/efile/1-Part(l )(3323287) 26.10.2021
Installation of Road Weighbridge by FCI TC-I/2020/108/efile/1-Part(l ) 25.10.2021
Integration of Weighbridge with FOIS TC-I/2020/108/efile/1 (332387) 18.10.2021
Guidelines regarding provision of weighbridges and weighment of wagons TC-I/2021/108/efile/1 (3366981) 07.09.2021
Acceptance of weighment of granite slab weighed at static road weighbridge at Karimnagar and two other goods sheds TC-I/2020/109/SCR/Granite (3318226) 18.08.2021
Integration of weighbridges with FOIS- Read only access to private siding TC-I/2020/108/efile/1(3323287) 27.07.2021
Guidelines regarding Punitive Charge and mis-declaration in case of container traffic TC-1/2020/302/efile (3333729) 12.03.2021
Integration of Electronic in Motion Weighbridges (EIMWB) with Freight Operation Information System (FOIS). TC-I/2020/108/efile/1 07.01.2021
Installation of weighbridge on Railway land by private party TC-I/2020/108/efile/1/Pt.(1) (3325217) 24.06.2021
Integration of Electronic in motion weighbridges (EIMWB) with freight Operation Information System (FOIS) TC-I/2020/108/efile/1(3323287) 05.02.2021
Acceptance of weighment of granite slab at static road weighbridge at Karimnagar and two other goods sheds TC-I/2020/109/SCR/Granite 15.10.2020
Guidelines regarding provision of weighbridge and weighment of rakes TC-I/2020/108/efile/1 28.09.2020
Transmission of weighment data from weighbridge to TMS by linking all weighbridges with FOIS  TC-1/2020/108/efile/1-Part(1) 24.09.2020
Transmission of weighment data from weighbridge to TMS by linking all weighbridge with FOIS TC-I/2020/108/efile/1 24.08.2020
Integration of all In-motion Weighbridges with FOIS TC-I/2020/108/efile/1 14.08.2020
Acceptance of weighment of granite slab at static road weighbridge at Karimnagar and two other goods sheds TC-I/2020/109/SCR/Granite 30.07.2020
Transmission of weighment data from weighbridge to TMS by linking all weighbridges with FOIS TC-1/2019/108/1 27.07.2020
Electronic Static Weighbridge at Sidings of Bhilai Steel Plant TC-I/2020/108/efile/1 02.11.2020
Guidelines regarding provision and functioning of weigh bridges TC-I/2019/08/1 14.01.2020
Acceptance of weighment witnessed by KOPT staff for preparation of RR TC-I/2019/108/2 15.11.2019
Areas of Responsibility of Electronic in-motion weighbridge TC-I/2016/108/3 20.09.2019
Integration of weighbridge with FOIS - Procedure to capture weighment details in TMS/FOIS and modification thereof after load adjustment of overloaded wagon Rate Circular No. 01 of 2019 07.02.2019
Preparation of online Goods Balance sheet and integration of weighbridges with FOIS TC-I/2015/108/8/Pt. 13.03.2019
Loading of food grains through SILOs in BCBFG wagons TC-I/2014/108/2 01.04.2019
Guidelines for installation and maintenance of electronic in-motion weighbridge(EIMWB) by private parties TC-I/2014/108/4 26.09.2018
Doing away with the 5% random weighment in the case of HR/CR Coil TC-I/2014/108/4 07.08.2018
Functioning of weighbridges and weighment of wagons/rakes TC-I/2014/108/4 07.03.2018
Utilization of Pre-weighbin system in lieu of Electronic-in-motion weighbridge at M/s Singareni Collieries Co. Ltd. TC-I/2005/108/3/Pt. IV 13.12.2017
Functioning of weighbridges and weighment of wagons/rakes TC-I/2014/108/4) 21.03.2017
Functioning of weighbridges to be reported TC-I/2014/108/2)  03.03.2016
Integration of weighbridges with FOIS TC-I/2015/108/8-pt) 01.11.2016

Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 14-02-2025